Aurora Town Hall/Seniors’ Centre Parking Lot Rehabilitation and Reflection Space Construction

Share Aurora Town Hall/Seniors’ Centre Parking Lot Rehabilitation and Reflection Space Construction on Facebook Share Aurora Town Hall/Seniors’ Centre Parking Lot Rehabilitation and Reflection Space Construction on X (formerly Twitter) Share Aurora Town Hall/Seniors’ Centre Parking Lot Rehabilitation and Reflection Space Construction on Linkedin Email Aurora Town Hall/Seniors’ Centre Parking Lot Rehabilitation and Reflection Space Construction link

We’re giving the Town Hall and Seniors’ Centre parking lots a refresh!

This project will make it easier and safer for everyone to park, walk, and get around. We’re replacing the pavement, improving walkways and entrances, and adding brighter, energy‑efficient lighting. The south parking lot will also be reconfigured to create 13 new parking spaces.

Before parking lot work begins, roof repairs at Town Hall and the Seniors’ Centre will be completed. And out front of Town Hall, we’re creating a new community reflection space—a welcoming place for residents to gather, pause, and connect.

We’re giving the Town Hall and Seniors’ Centre parking lots a refresh!

This project will make it easier and safer for everyone to park, walk, and get around. We’re replacing the pavement, improving walkways and entrances, and adding brighter, energy‑efficient lighting. The south parking lot will also be reconfigured to create 13 new parking spaces.

Before parking lot work begins, roof repairs at Town Hall and the Seniors’ Centre will be completed. And out front of Town Hall, we’re creating a new community reflection space—a welcoming place for residents to gather, pause, and connect.

  • August 18th, 2026

    Share August 18th, 2026 on Facebook Share August 18th, 2026 on X (formerly Twitter) Share August 18th, 2026 on Linkedin Email August 18th, 2026 link

    Parking Lot:

    Crews are finalizing concrete work this week and grading the parking lot and preparation for asphalt. Paving is expected to follow shortly.


    Reflection Space:

    Crews have nearly finished forming the concrete curbs with concrete expected to be poured this week. Once complete, work will move into installing the new interlocking areas.

    Parking Lot:

    Crews are finalizing concrete work this week and grading the parking lot and preparation for asphalt. Paving is expected to follow shortly.


    Reflection Space:

    Crews have nearly finished forming the concrete curbs with concrete expected to be poured this week. Once complete, work will move into installing the new interlocking areas.

  • August 14th, 2026

    Share August 14th, 2026 on Facebook Share August 14th, 2026 on X (formerly Twitter) Share August 14th, 2026 on Linkedin Email August 14th, 2026 link

    Parking Lot:

    Electrical work is now complete and we are awaiting delivery of the new light poles expected near the end of the month. In the meantime, crews are grading and preparing the parking lot for asphalt paving.

    Reflection Space:

    Work continues to progress well in the reflection space. Crews are currently installing the concrete curb edging, and preparation for the new interlocking.

    Parking Lot:

    Electrical work is now complete and we are awaiting delivery of the new light poles expected near the end of the month. In the meantime, crews are grading and preparing the parking lot for asphalt paving.

    Reflection Space:

    Work continues to progress well in the reflection space. Crews are currently installing the concrete curb edging, and preparation for the new interlocking.

  • August 10th, 2026

    Share August 10th, 2026 on Facebook Share August 10th, 2026 on X (formerly Twitter) Share August 10th, 2026 on Linkedin Email August 10th, 2026 link
    supporting image

    Parking Lot:

    The electrical crew has made good progress by installing several new light pole bases. Co for these bases is planned for tomorrow as work continues to move forward.


    Reflection Space:

    The crew has successfully poured several new concrete features. Next, they will remove the forms, and complete the new retaining walls as they finish this phase of the project.

    The attached photo was taken during last week’s concrete pour. It shows the extent of wooden formwork required to hold the wet concrete in place until it dries.

    Parking Lot:

    The electrical crew has made good progress by installing several new light pole bases. Co for these bases is planned for tomorrow as work continues to move forward.


    Reflection Space:

    The crew has successfully poured several new concrete features. Next, they will remove the forms, and complete the new retaining walls as they finish this phase of the project.

    The attached photo was taken during last week’s concrete pour. It shows the extent of wooden formwork required to hold the wet concrete in place until it dries.

  • August 6th, 2026

    Share August 6th, 2026 on Facebook Share August 6th, 2026 on X (formerly Twitter) Share August 6th, 2026 on Linkedin Email August 6th, 2026 link
    supporting image

    Parking Lot:

    Electrical work is progressing well with crews continuing to install the new wiring throughout the parking lot next week. The crew is expected to begin excavating and preparing the foundations for the new light poles.


    Reflection Space:

    Work continues to progress in the reflection space. Crews are preparing several new concrete futures with concrete pouring scheduled for tomorrow.

    In the image attached, we can see the successful installation of three new soil cells (black squares) to support the root growth of new trees to be planted here.

    Parking Lot:

    Electrical work is progressing well with crews continuing to install the new wiring throughout the parking lot next week. The crew is expected to begin excavating and preparing the foundations for the new light poles.


    Reflection Space:

    Work continues to progress in the reflection space. Crews are preparing several new concrete futures with concrete pouring scheduled for tomorrow.

    In the image attached, we can see the successful installation of three new soil cells (black squares) to support the root growth of new trees to be planted here.

  • August 4th, 2026

    Share August 4th, 2026 on Facebook Share August 4th, 2026 on X (formerly Twitter) Share August 4th, 2026 on Linkedin Email August 4th, 2026 link

    Parking Lot:

    Last week the existing asphalt was successfully removed from the parking lot. Work is continuing this week with the installation of new light poles.

    Reflection Space:

    Good progress continues in the Reflection space. Crews are preparing for several new concrete futures scheduled to be poured later this week.

    Parking Lot:

    Last week the existing asphalt was successfully removed from the parking lot. Work is continuing this week with the installation of new light poles.

    Reflection Space:

    Good progress continues in the Reflection space. Crews are preparing for several new concrete futures scheduled to be poured later this week.

  • Construction Notice - July 30th, 2026

    Share Construction Notice - July 30th, 2026 on Facebook Share Construction Notice - July 30th, 2026 on X (formerly Twitter) Share Construction Notice - July 30th, 2026 on Linkedin Email Construction Notice - July 30th, 2026 link

    Parking Lot:

    Significant progress continues in the parking lot with crews completing the installation of the new storm drainage system. Most concrete removals have also been completed with only minor remain work and select areas

    On Friday, July 31st, crews are scheduled to begin removing the existing asphalt as they prepare for the new parking lot. This operation will involve heavy equipment and may generate increased noise and dust throughout the day. We appreciate your patience as this phase of construction moves forward.


    Reflection Space:

    Work and the reflection space continues to advance with the new storm drainage system near in completion. Crews are currently constructing armour stone retaining walls, and shaping the new landscaping for the next stages of construction.

    Parking Lot:

    Significant progress continues in the parking lot with crews completing the installation of the new storm drainage system. Most concrete removals have also been completed with only minor remain work and select areas

    On Friday, July 31st, crews are scheduled to begin removing the existing asphalt as they prepare for the new parking lot. This operation will involve heavy equipment and may generate increased noise and dust throughout the day. We appreciate your patience as this phase of construction moves forward.


    Reflection Space:

    Work and the reflection space continues to advance with the new storm drainage system near in completion. Crews are currently constructing armour stone retaining walls, and shaping the new landscaping for the next stages of construction.

  • July 27th, 2026

    Share July 27th, 2026 on Facebook Share July 27th, 2026 on X (formerly Twitter) Share July 27th, 2026 on Linkedin Email July 27th, 2026 link

    Parking Lot:

    Crews progressed well last week, completing large sections of new curb and sidewalk. The new storm pipe infrastructure is nearing completion, enabling work to progress onto the next stage of asphalt removal.


    Reflection Space:

    The crew is completing the installation of three new soil cells which will help support root growth for the new trees. Work will continue on installing the remainder of the new drainage system this week.


    Parking Lot:

    Crews progressed well last week, completing large sections of new curb and sidewalk. The new storm pipe infrastructure is nearing completion, enabling work to progress onto the next stage of asphalt removal.


    Reflection Space:

    The crew is completing the installation of three new soil cells which will help support root growth for the new trees. Work will continue on installing the remainder of the new drainage system this week.


  • Temporary Accessible Access

    Share Temporary Accessible Access on Facebook Share Temporary Accessible Access on X (formerly Twitter) Share Temporary Accessible Access on Linkedin Email Temporary Accessible Access link
    supporting image

    A temporary accessible access ramp has been installed at the Aurora Seniors' Centre to help maintain access during construction.

    Please note that this area is for accessible pick-up and drop-off only. No parking is permitted.

    Thank you for your cooperation as construction continues.

    A temporary accessible access ramp has been installed at the Aurora Seniors' Centre to help maintain access during construction.

    Please note that this area is for accessible pick-up and drop-off only. No parking is permitted.

    Thank you for your cooperation as construction continues.

  • July 21st, 2026

    Share July 21st, 2026 on Facebook Share July 21st, 2026 on X (formerly Twitter) Share July 21st, 2026 on Linkedin Email July 21st, 2026 link

    Parking Lot:

    Crews successfully completed a large portion of sidewalk and curb, with construction progressing steadily across the site. Work continues on the underground storm pipe system.

    Reflection Space:

    Crews continue to make good progress in the reflection space with the underground drainage system prepared for installation.

    Parking Lot:

    Crews successfully completed a large portion of sidewalk and curb, with construction progressing steadily across the site. Work continues on the underground storm pipe system.

    Reflection Space:

    Crews continue to make good progress in the reflection space with the underground drainage system prepared for installation.

  • July 20th, 2026

    Share July 20th, 2026 on Facebook Share July 20th, 2026 on X (formerly Twitter) Share July 20th, 2026 on Linkedin Email July 20th, 2026 link

    Parking Lot:

    Last week saw good progress on removals and the installation of new a manhole and two catch basins. Today, crews will pour new sidewalk near the seniors centre while the removals crew works ahead of them.


    Reflection Space:

    Crews uncovered abandoned retaining walls which required additional removals. Today, crews will continue preparing the site and begin installation of the underground drainage system.


    Parking Lot:

    Last week saw good progress on removals and the installation of new a manhole and two catch basins. Today, crews will pour new sidewalk near the seniors centre while the removals crew works ahead of them.


    Reflection Space:

    Crews uncovered abandoned retaining walls which required additional removals. Today, crews will continue preparing the site and begin installation of the underground drainage system.


Page last updated: 18 Sep 2026, 02:15 PM